Search results

Jump to: navigation, search

Page title matches

  • ...ystem is installed by the Stack Installer, a valid license is required and the group is created automatically. * A Group is typically composed of projects using the same type of repositories (SVN for instance)
    9 KB (1,406 words) - 16:47, 22 March 2018

Page text matches

  • ...abs). If you have not setup the basic infrastructure jobs or the tabs, run the scripts to do so. ...the <code>jenkins-cli.jar</code> file, setting some variables, and running the script.
    6 KB (977 words) - 23:12, 26 August 2022
  • ...A [[Terms_and_Definitions#LingoportProject|Lingoport project]] consists of the [[Terms_and_Definitions#Globalyzerproject|Globalyzer]] project and an [[Ter ...ts are pushed to the Lingoport Dashboard. The on-boarding process includes the following:
    8 KB (1,283 words) - 17:22, 20 March 2024
  • = On-Boarding = *[[On Boarding Overview]]
    898 bytes (105 words) - 15:23, 30 November 2021
  • On the Unix box, install TFS command line, (TEE-CLC) for example: ...jenkins' user for the TFS user with the following flag set to true so that the user name / password are remembered for subsequent TFS command do not need
    1 KB (190 words) - 20:13, 2 December 2016
  • See a definition of this term on the Terms and Definition page by clicking this link. ...ode is the system is the system that performs the work before returning to the Master node. There can be one or more Agent Nodes.
    13 KB (1,877 words) - 21:23, 10 December 2019
  • ...ystem is installed by the Stack Installer, a valid license is required and the group is created automatically. * A Group is typically composed of projects using the same type of repositories (SVN for instance)
    9 KB (1,406 words) - 16:47, 22 March 2018
  • ...the project is created and the Jenkins job runs successfully, as noted by the blue sphere. After the Jenkins job completes, the Lingoport Dashboard is populated and for this project it looks like:
    2 KB (253 words) - 17:21, 20 March 2024
  • ...done a number of different ways that depend on different factors including the translation management system. Lingoport strongly recommends using the FTP protocol. With that approach,
    16 KB (2,396 words) - 19:02, 26 August 2022
  • = Before On Boarding a Localyzer project= To on-board a project, a number of basic information is needed:
    12 KB (1,842 words) - 17:23, 20 March 2024
  • =Before On Boarding a Globalyzer Project = ...heck]] for Globalyzer. Before on boarding a Globalyzer project, please do the pre-flight check.
    4 KB (620 words) - 17:23, 20 March 2024
  • = Before On Boarding a project with both LRM and Globalyzer= To on-board a project, a some basic information is needed:
    10 KB (1,501 words) - 17:24, 20 March 2024