Difference between revisions of "Advanced Settings"

From Lingoport Wiki
Jump to: navigation, search
(Other Advanced Settings)
 
(9 intermediate revisions by the same user not shown)
Line 10: Line 10:
   
 
= Task Schedule =
 
= Task Schedule =
  +
  +
[[File:TaskSchedule.jpg|700px|center]]
  +
  +
The Task Schedule determines how often projects are analyzed. They can be analyzed once a day with the time to be determined. Or they can be analyzed several times per day. At the designated time, all projects are queued to run.
   
 
= Other Advanced Settings =
 
= Other Advanced Settings =
  +
  +
[[File:OtherAdvancedSettings.jpg|700px|center]]
  +
  +
* '''System Timezone''': When the time zone is set, the logs will show the corresponding time.
  +
* '''Keep Logs''': How many days to keep the log files.
  +
* '''Max Jobs Running''': How many jobs to attempt to run concurrently. This can be modified to improve system performance.
   
 
= Dashboard Issues Migration =
 
= Dashboard Issues Migration =
  +
  +
An Administrator can migrate the Dashboard Globalyzer issues Status to Command Center if the issues exist in Command Center.
  +
  +
1. You need to create a Command Center project, the project name doesn't need to match the Dashboard project because we will map them manually.
  +
  +
2. In Maintenance Mode, select '''Settings -> Advanced Settings''' select '''Dashboard Issues Migration'''
  +
  +
[[File:dashmig.png|600px|center]]
  +
  +
3. Fill out the URL and the login information for the Dashboard. '''Next'''
  +
  +
4. Connect with the Dashboard
  +
  +
[[File:Dashmigmatch.png|600px|center]]
  +
  +
5. Pair the Command Center project with the Dashboard project, you can migrate one project or many projects' issues. '''Migrate'''

Latest revision as of 01:42, 13 September 2023

Introduction

CCAdvancedSettings.jpg

System Environment Variables

Advanced Git Settings

Translation Kit Due Dates

Task Schedule

TaskSchedule.jpg

The Task Schedule determines how often projects are analyzed. They can be analyzed once a day with the time to be determined. Or they can be analyzed several times per day. At the designated time, all projects are queued to run.

Other Advanced Settings

OtherAdvancedSettings.jpg
  • System Timezone: When the time zone is set, the logs will show the corresponding time.
  • Keep Logs: How many days to keep the log files.
  • Max Jobs Running: How many jobs to attempt to run concurrently. This can be modified to improve system performance.

Dashboard Issues Migration

An Administrator can migrate the Dashboard Globalyzer issues Status to Command Center if the issues exist in Command Center.

1. You need to create a Command Center project, the project name doesn't need to match the Dashboard project because we will map them manually.

2. In Maintenance Mode, select Settings -> Advanced Settings select Dashboard Issues Migration

Dashmig.png

3. Fill out the URL and the login information for the Dashboard. Next

4. Connect with the Dashboard

Dashmigmatch.png

5. Pair the Command Center project with the Dashboard project, you can migrate one project or many projects' issues. Migrate