Difference between revisions of "Advanced Settings"

From Lingoport Wiki
Jump to: navigation, search
(Task Schedule)
(Task Schedule)
Line 11: Line 11:
 
= Task Schedule =
 
= Task Schedule =
   
[[File:File:TaskSchedule.jpg|700px|center]]
+
[[File:TaskSchedule.jpg|700px|center]]
   
 
The Task Schedule determines how often projects are analyzed. They can be analyzed once a day with the time to be determined. Or they can be analyzed several times per day. At the designated time, all projects are queued to run.
 
The Task Schedule determines how often projects are analyzed. They can be analyzed once a day with the time to be determined. Or they can be analyzed several times per day. At the designated time, all projects are queued to run.

Revision as of 01:36, 13 September 2023

Introduction

CCAdvancedSettings.jpg

System Environment Variables

Advanced Git Settings

Translation Kit Due Dates

Task Schedule

TaskSchedule.jpg

The Task Schedule determines how often projects are analyzed. They can be analyzed once a day with the time to be determined. Or they can be analyzed several times per day. At the designated time, all projects are queued to run.

Other Advanced Settings

Dashboard Issues Migration

An Administrator can migrate the Dashboard Globalyzer issues Status to Command Center if the issues exist in Command Center.

1. You need to create a Command Center project, the project name doesn't need to match the Dashboard project because we will map them manually.

2. In Maintenance Mode, select Settings -> Advanced Settings select Dashboard Issues Migration

Dashmig.png

3. Fill out the URL and the login information for the Dashboard. Next

4. Connect with the Dashboard

Dashmigmatch.png

5. Pair the Command Center project with the Dashboard project, you can migrate one project or many projects' issues. Migrate